What is MS4?
* MS4: Municipal Separate Storm Sewer System.
* The Lehigh River has been identified as impaired with total suspended solids (TSS).
* Easton must reduce this sediment by 10% (60,670 pounds/year) over a 5 year period.
Pollution Reduction Plan Module:
- Create an online manual for the development of an EPA-Storm Water Management Model (SWMM)
 
- Complete a SWMM for the City of Easton
 
- Determine land use and physical parameters for the SWMM
 
- Develop a Best Management Practices (BMP) Module
 
- Analyze BMP locations and constraints through a Geographic Information System (GIS)
 
Compliance Module:
- Develop a GIS for the field inspection of BMPs
 
- Create an illicit detection and elimination program through GIS
 
- Public education, outreach, involvement, and participation
 
Modeling Objectives:
- Delineation of catch basin watersheds
 
- Integrate land use and physical parameters
 
- Integrate rainfall data
 
- Integrate proposed BMPs
 

Modeling Results:
- Determined storm sewer system capacity
 
- Determined TSS for 1 year – existing conditions
 
- Determined TSS for 1 year – proposed BMPs
 
- 5.2% TSS removal with proposed BMPs
 

BMP Types and Locations:

